Revenue (BOQ) refers to the Bill of Quantities (BOQ), it . It is a detailed document used in construction and project management to outline the estimated quantities of materials, labor, and overhead costs needed for a project. It serves as a key reference for calculating the revenue of a project's revenue, particularly for projects that are priced based on quantities of work.

...

The revenue will remain same, but the overhead, Total cost and markup will be changed. For example previously the revenue was 1450.15 and changed in overhead it remain the same.


Import BOQ from file

This feature simplifies the process of entering BOQ data by importing it from an Excel file instead of manually typing each line.

The imported Excel file (or pasted data) must match these columns:

  1. Hierarchy Code – Code indicating the level or structure of the BOQ item in the project hierarchy.

  2. WBS Code – Work Breakdown Structure code for organizing work packages.

  3. Is Group – Boolean (yes/no or 1/0) to indicate if the item is a group header.

  4. Item Code – Unique code for the BOQ item.

  5. Description – Short description of the item.

  6. Full Description – Detailed description of the item (optional).

  7. Quantity – Number of units required.

  8. UOM – Unit of Measure (e.g., m², kg, hr).

  9. Comment Only – Optional notes for reference only (not used in calculation).